Customization: | Available |
---|---|
Type: | Electric, Diesel, Hydraulic |
Flow Range: | 200-4000gpm |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Foam Pump Skid Balanced Pressure Proportioning System For Fire Fighting
Model | Size of Proportioner (mm) | Working Pressure Range (MPa) | Flow Range (L/S) | Mixing Ratio |
PHP3/24 | DN65 | 0.6~1.2 or 0.6~1.6 |
6~24 | 3%~3.9% or 6%~7% |
PHP6/24 | ||||
PHP3/42 | DN100 | 18~42 | ||
PHP6/42 | ||||
PHP3/72 | 18~72 | |||
PHP6/72 | ||||
PHP3/100 | DN150 | 24~100 | ||
PHP6/100 | ||||
PHP3/120 | 24~120 | |||
PHP6/120 | ||||
PHP3/160 | 24~160 | |||
PHP6/160 | ||||
PHP3/200 | DN200 | 48~200 | ||
PHP6/200 | ||||
PHP3/260 | 48~260 | |||
PHP6/260 | ||||
PHP3/300 | DN250 | 75~300 | ||
PHP6/300 | ||||
PHP3/400 | 75~400 | |||
PHP6/400 |
Instruction
1. Make cement concrete platforms for both the system and foam storage tank before installation. These two platforms should be in an equivalent level and close to each other. (The approximate distance between system foam inlet and storage tank foam outlet is 70-100cm)
2. Put the system and storage tank on their respective platforms and fix them with foundation bolts.
3. Connect storage tank foam outlet with system foam inlet with corrugated flexible pipe. Same with storage foam reflux inlet and system foam reflux inlet.
FAQ
1. Do your offer free sample for your clients?
Yes, we offer free sample for many of the products
2. What's the MOQ of your products?
Our MOQ is one (1) piece/set.
3. Are you manufacturer with your own factory?
Yes, we are the manufacturer for more than 20 years
4. What's your payment terms?
We accept T/T, L/C, Western Union, Paypal,etc.
5. How long is the delivery time?
Usually around 15 days after payment.
6. Do you have technical support?
Yes, we have a professional engineering team.
7. Do you have warranty?
Yes, all products have one year warranty.
8. Can you accept OEM?
Yes, we do customized design for our clients.